Hollister Avenue Bridge (Project No. 9033)

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Description

This project will replace the Hollister Avenue Bridge over San Jose Creek. The new bridge will have a 100 year storm flow capacity and will be designed to fit with the recently completed downstream San Jose Creek Capacity Improvement & Fish Passage project.

Purpose and Need

Laboratory testing has confirmed that the existing bridge was constructed using reactive aggregate and is deteriorating rapidly. The existing bridge does not conform to current design standards and retrofitting is not feasible. The replacement of this bridge also completes the San Jose Creek Capacity improvements project by removing the geometric constraints on the channel under the existing bridge.

Strategic Plan Goals

Strengthen Infrastructure

Return Old Town to a Vital Center of the City

Funding Sources

Funding for this project is a combination of sources, including the Federal Highway Bridge Program (HBP) funds. The project will be funded 88.53% by the HBP.

Current Phase

The City of Goleta approved a Mitigated Negative Declaration (MND) for the project in August 2015. Final design, right of way and permitting phases are currently underway. Final design is at the 95% development stage. Construction is anticipated to begin in FY 2019/20 at the same time as construction of the City’s Ekwill Street and Fowler Road Extensions Project. 

HollisterAvenueBridge_MND_FINAL

PROJECT MANAGER:

Gerald Comati, P.E.
Contract Project Manager
gcomati@cityofgoleta.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer