Goleta, CA
Home MenuMarriott Residence Inn and Hollister Center Project REVISED FINAL EIR Part 1
The Revised Final EIR for the Marriott Residence Inn and Hollister Center Project (12-EIR-1; SCH #2007121058) dated June, 2014 is comprised of two parts:
Part 1 consists of the October 2013 proposed Final EIR located at the bottom of this page.
Part 2 includes the documents below and is located here
-Comment letters and responses to the comments received during the additional public review period (December 3, 2013 – February 3, 2014);
-Changes to the Revised Draft EIR (February 2013) and proposed Final EIR (October 2013) which were triggered by these newest comments;
-An updated AllianceJB traffic report to clarify inconsistencies in the October 2011 report; and
-An updated Penfield and Smith Engineers drainage memo confirming that the project grading and drainage plan complies with the most recent Regional Water Quality Control Board stormwater directives.
The Planning Commission will consider the RFEIR and related actions on Monday, July 28th at 6:00pm. Further details are located in the Notice below.
FINAL Environmental Impact Report (FEIR), dated October, 2013
- 0.0 Cover and TOC (0.2mb)
- 1.0 Executive Summary (0.3mb)
- 2.0 Project Description (19.4mb)
- 3.0 Related Projects (0.1mb)
- 4.1 Aesthetics (8.5mb) Video Simulation (Link to City YouTube site)
- 4.2 Air Quality (0.2mb)
- 4.3 Biological Resources (0.4mb)
- 4.4 Cultural Resources (0.3mb)
- 4.5 Geology and Soils (0.6mb)
- 4.6 Greenhouse Gas Emissions (0.1mb)
- 4.7 Hazards and Hazardous Materials (0.8mb)
- 4.8 Hydrology and Water Quality (0.1mb)
- 4.9 Land Use and Planning (0.3mb)
- 4.10 Noise (1.6mb)
- 4.11 Public Services (0.7mb)
- 4.12 Transportation and Traffic (1.9mb)
- 4.13 Utilities and Service Systems (0.1mb)
- 5.0 Other CEQA Concerns (0.1mb)
- 6.0 Alternatives (0.7mb)
- 7.0 Preparers, Contacts, and References (0.2mb)
- 8.0/1 Responses to Comments (NAHC) (0.8mb)
- 8.2 Responses to Comments 2 (APCD) (0.6mb)
- 8.3 Responses to Comments 3 (NAHC) (0.6mb)
- 8.4 Responses to Comments 4-1 (Arredondo) (16.4mb)
- 8.4 Responses to Comments 4-2 (Arredondo) (6.9mb)
- 8.5 Responses to Comments 5 (Chytilo) (3.0mb)
- 8.6 Responses to Comments 6 (Dudek) (4.5mb)
- 8.7 Responses to Comments 7 (Dudek) (5.9mb)
- 8.8 Responses to Comments 8 (CARD) (0.8mb)
APPENDICES:
- Appendix Cover (0.1mb)
- Table of Contents (0.1mb)
- Appendix A Design Review Board Minutes (1.3mb)
- Appendix B Visual Simulations Comparing November 2009 and March 2010 Project Designs (16.9mb) Video Simulation (Link to City YouTube site)
- Appendix C CalEEMod Emissions Print-Out (July 2012) (0.3mb)
- Appendix D Dudek Memo: Hollister Frontage Improvements (September 2010) (1.5mb)
- Appendix D1 County Flood Control 1964 Topo Map of Project Area (0.2mb)
- Appendix E Hushmand Associates Inc. Addendum (April 2010) (0.1 mb)
- Appendix F Hushmand Geotechnical Investigation (September 2007) (3.3mb)
- Appendix G Pacific Materials Laboratory Foundation Design (January 2007) (2.6mb)
- Appendix H Pacific Materials Laboratory Soil Corrosivity (March 2007) (0.4mb)
- Appendix I GHG Study (January 2011) (1.3mb)
- Appendix J Response to Request for Additional Soil and Groundwater Assessment (August 2011) (1.6mb)
- Appendix K Fire Department Hazardous Materials Letter (December 2010) (0.3mb)
- Appendix L Environmental Document Review (0.5mb)
- Appendix M Penfield and Smith Drainage Report Information Update (September 2012) (0.2mb)
- Appendix N Penfield and Smith Drainage Report Information Update (July 2010) (0.9mb)
- Appendix O Penfield and Smith Drainage Report (July 2008) (6.4mb)
- Appendix P Alliance Traffic Report and Attachments (October 2010) (1.9mb)
- Appendix P1 Ekwill Fowler EIR Traffic Tables 2-4 and 2-5 (August 2011) (1.1mb)
- Appendix Q Notice of Preparation (NOP) (15.2mb)
- Appendix R1 Applicant Correspondence (0.7mb)
- Appendix R2 Project Correspondence (2.9mb)
- Appendix S 2010 University of California, Santa Barbara Long Range Development Plan Mitigation Implementation and Settlement Agreement (2.3mb)
- Appendix T Notices (0.4mb)
- Appendix U Public Works Recommended Conditions of Approval (0.4mb)
- Appendix V Excerpts from Section 3.2, Agriculture and Farmland, of the Goleta General Plan/Coastal Land Use Plan FEIR (1.6mb)
- Appendix W Letter Regarding Archaeological Resources Mitigation Costs (0.5mb)
- Appendix X Environmental Hearing Minutes (March 21, 2013) (0.1mb)