Description

This project will replace deteriorated or missing sidewalk along both sides of Magnolia Avenue from Hollister Avenue south to Gaviota Street. The project includes curb, gutter, sidewalk, driveway, ADA access ramps, and tree replacements.

 Magnolia project location

Purpose and Need

There is currently a gap in the sidewalk along the east side of Magnolia Avenue just south of Hollister Avenue for approximately 140 feet making pedestrian travel difficult. This project will fill the sidewalk gap with new sidewalk to provide continuous accessibility and increase safety for pedestrians. The project will also replace deteriorated sidewalk on the west side as well as driveway apron and ADA access ramps.

Strategic Plan Goals

Strengthen infrastructure and maintain a safe community.

Funding Sources

Funding for this project is through Measure A local funds and US Housing and Urban Development - Community Development Block Grant.

Current Phase

Construction has started on the Magnolia Sidewalk Infill Project. To improve pedestrian travel in the area, the existing sidewalk will be removed and new sidewalk will be constructed on both sides of Magnolia Avenue between Hollister Avenue and Gaviota Street. The project will take about six weeks to complete (early November 2017) and make improvements to walking paths, sight distance at the intersections for drivers, drainage along Magnolia Avenue, and driveway access. All businesses will remain open during construction.

Project Manager:

James Winslow, Sr. Project Engineer
jwinslow@cityofgoleta.org
805-961-7577

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer